Cobot Welding Setup Checklist

Use this checklist to confirm your shop is ready for a cobot welding system before installation or startup.

Shop Space

Minimum 8 ft × 8 ft clear floor space
Level, stable floor surface
Adequate overhead clearance (10 ft minimum)
Proximity to power source
Access for material handling

Power

208V or 230V single-phase available
Dedicated 50A circuit breaker
Proper grounding verified
Electrician sign-off if required
Surge protection recommended

Shielding Gas

Gas cylinder secured and accessible
Regulator and flowmeter installed
Hose length appropriate for setup
Gas type matches application (Ar/CO₂ mix)
Leak test completed

Welding Wire and Consumables

Wire diameter matches application
Wire spool loaded and feeding smoothly
Contact tips on hand (correct size)
Nozzles and diffusers available
Anti-spatter spray or dip ready

Fixtures

Fixture design finalized and built
Repeatable part location confirmed
Clamps or magnets secure parts properly
Fixture height suits robot reach
Clearance verified for torch movement

Part Prep

Parts cleaned (no oil, rust, or paint)
Fit-up tolerances meet weld spec
Tack welds in place if required
Consistent part geometry batch-to-batch
Sample parts available for programming

Operator Considerations

Operator trained on cobot safety protocols
PPE available (gloves, sleeves, safety glasses)
E-stop locations understood
Basic troubleshooting knowledge in place
Maintenance schedule reviewed

Final Team Review

Before installation, confirm the work area, power, gas, wire, fixtures, parts, and operator responsibilities are ready.